Good morning! It’s May 26 — here’s what’s going on in your community today…

Cloudy with a shower in East Springfield

Today will be cloudy with a shower. There is a 59% chance of rain. The high will be 65 with a low of 47. Allergy sufferers beware: there are high amounts of ragweed and high amounts of tree pollen in the air. Cloudy now, changing to showers at 8 a.m.

Looking ahead: Expect showery weather late Monday night through late tonight


East Springfield news


Lookout Eugene-Springfield

What’s new around you

▼︎ police incidents   ▼︎ road incidents   ▼︎ food inspections

Map of A map showing the locations of informaton from today's newsletter

Read on to see the details about each item…


Restaurant inspections

County officials regularly inspect food facilities to ensure compliance with state laws. Here, Lookout Eugene-Springfield reports both those who have passed the inspections and those where the county observed issues to correct. The county’s full ongoing reports can be accessed here.

  • Styr Kitchen Llc at 150 28th St., was cited for issues during a county health inspection on May 10. The restaurant scored 92 out of 100. Inspectors found employee drinks stored above food, risking contamination, but this was fixed during the visit. A spray bottle with toxic chemicals was unlabeled, but labels were added immediately. The freezer and refrigerator door seals are damaged and need repair. Outdoor trash dumpsters were left open and must be kept closed at all times. Lastly, a wall near the handwashing area is deteriorating and requires repair. Overall, the restaurant addressed the immediate safety issues but needs to fix equipment and facility maintenance problems. (view report)
     

Community crime report

  • A vehicle hit a pedestrian near 2659 Olympic St., Springfield on May 24 at noon
     
  • A robbery was reported near 317 30th St. in Springfield at 11 p.m. on May 22.
     
  • A police chase happened near 5755 Main St., Springfield at 11 p.m. on May 25.
     
  • Police served a warrant and made an arrest near 4708 Main St., Springfield at 10 p.m. on May 24.
     
  • Police served a warrant and made an arrest near Daisy St. and S 48th St. in Springfield at 9 a.m. on May 24.
     

Roadwork is affecting traffic near you

  • Long-term projects: Construction is happening on 36th Street between Main Street and Commercial Avenue as part of the GO Bond Street Repair Project. Work started the week of April 27 and is expected to finish by September 30. Local access to homes will stay open, but there will be temporary lane and driveway closures, and some areas will have no parking. You may notice changes to travel routes, construction noise, dust, and heavy equipment. Advance notice will be given before any closures.