“I’d rather be doing this than playing golf.” The volunteer was debarking a western red cedar tree near the North Fork of the Willamette River, 30 miles north of Westfir.

I was the leader of this group, a volunteer myself, so we had volunteers helping volunteers.

Perhaps that is second-order volunteerism. In any case, it’s good for people, volunteers, volunteerism orders, and trails.

I’ve been an avid hiker for decades. In the nine years since I started doing trail work with Cascade Volunteers, I have been looking at trails with a closer eye to detail than I once did. I didn’t think when I began the work, at 68, that I had the strength for it. But with practice, patience and perseverance, I have been part of a crew clearing trails of obstructions, building bridges, fixing holes, establishing water drainage and restoring trails in burned areas, what we call “working in the black.” 

Twenty years ago, under the auspices of Judy Mitchell, then of the Forest Service, the few volunteers working in the forest were known as the High Cascade Forest Volunteers, which in 2019 became Cascade Volunteers.

The organization and dozens of contributing groups train volunteers on the job and — at an annual “skills college” to educate forest visitors — maintain trails, build retaining walls and bridges, identify invasive species, become certified in chainsaws and two-person crosscut saws, and lead stewardship projects in the forest.

Our tasks are not easy, but we get a great deal of satisfaction from walking back out of the woods at the end of the day, sometimes on a now-passable trail. We get to spend full days in the woods seeing areas close up for prolonged periods, especially when we build structures like bridges.

Several of us, part of the Scorpions Trail Crew, recently had to repair one of a series of bridges 30 miles south of Oakridge, which we had made in 2025. 

Trails, especially those along rivers, need bridges over tributaries, and this particular bridge we built from onsite western red cedar. We had cut the cedar, carried in planks by hand and nailed them to the stringers. After building three such bridges in a few hundred yard stretch, we were very lucky that the Emigrant Fire just missed burning our bridges, although unfortunately did not spare others along the Middle Fork River.

Our bridge, however, did not survive a huge tree that recently fell on it. Two days before we worked, two of the crew cut the offending log off the bridge and went upstream to find and cut a western red cedar we could use for new stringers, two 12- to 15-inch diameter logs 12 feet long, supporting the bridge. The sills, one at each end supporting the stringers, were fortunately still intact. Nearly half of the decking or planks had to be replaced.

Eleven of us parked near Indigo Springs and hiked in on a faint muddy path for a couple of hundred yards that many of us knew from prior work — a slippery downhill to the main trail and about a hundred yards to the damaged structure. Three of us continued 200 yards further to the 40-foot long downed cedar, stripping its bark using draw knives, scrapers with a handle at each end. Others worked to ready the bridge for new wood.

The single tree was sufficient for the stringers and the “bull rail,” a thick piece of wood 6 inches to 7 inches in diameter serving as the edge of the bridge. The tree was cut twice, so logs could physically be carried through the woods to the work site. Six of us — three on each side — carried the stringer, each pair holding a yellow strap or choker wrapped around the log. Two others accompanied us, carrying smaller logs, placing them in front as rollers. In that way, we moved each of these logs to the bridge.

Adding new planks to the repaired bridge. Credit: Michael Smith

The stringers were attached to a wooden sill below using rebar and a hole drilled through the log. The two stringers were leveled, and the planks—the floor of the bridge—were nailed on. We used larger nails and an impact driver tool to attach the bull rail and by midafternoon were done.

We had to remove everything we brought in so we could use it the following week back on the North Fork, where we worked on larger and longer bridges, so we need a rope puller to move stringers, and where progress of 100 feet a day is good work.

Our day on the Middle Fork was one of the most satisfying days I’ve had out there. We all made suggestions, talked to each other, figured out what might and might not work. I’m quiet, process slowly, and often don’t say much, but I did suggest that six of us could carry the logs, which would speed the process greatly. I am grateful for the experience this day, and others in the crew felt the same.

I do look at trails with a much closer eye to detail than I once did, perhaps because I have spent so much time on the details.

Michael Smith writes for two local outdoor oriented organizations, hikes wherever and whenever he can, volunteers removing many different types of invasive plants, and clears and rebuilds trails in the Willamette National Forest and adjacent wildernesses. He lives in Eugene.